storage-shed 10/31/03—3/27/04

First wall is up.
Second wall is up.
Third wall is up.
And just after sundown, the fourth wall went up. Tomorrow is rafters, roof, and lots of windstorm tiedowns according to Nelson.
Day 2 - Alot of time was spent nailing in the zillion Simpson ties which are now required for "Wind Storm" insurance.
More ties.
Even had to put some over the garage door header and after that was done, the guys started building the ceiling joists.
Pretty much done with the ceiling joists and they got the ridge beam up at the end of the day but I didn't get a shot of it yet.
Day 3 - Rafters and ridge beam went up.
Wall decking almost done.
Day 4 - Rear window framed in and the roof decking got started.