Galleries > Recent
Tap F11 to Maximize
Home Index page First image Previous image Next image Last image
Image:
of 169
08MAY11 - It took us two days to get all the shrubs planted. Probably could have managed it in one day if it weren't for the dense root structure of that oak tree. The digging within a dozen feet or so of that tree, even the shallow holes for the smaller plants, too about 20 times longer than the digging in the non-root areas.