Galleries > Recent
Tap F11 to Maximize
Home Index page First image Previous image Next image Last image
Image:
of 166
28JUL10 - When we put up the second building in the backyard, I installed a service panel that I thought would be more than adequate for the life of the building. But during the Project from Hell remodelling when we had to install a second 42 breaker panel at the house, I decided to pull a cable from that new panel to the back building that would give me 100 amp service for a welder, saw, etc.

So, once we finally got the cable pulled to the building, this old panel had to go.