Galleries > Projects > Kitchen-Bath Remodel (3/06)
Home Index page First image Previous image Next image Last image
Image:
of 194
(11AUG) We've been steadily whittling down the ToDo list but nothing to photograph until today. After literally months waiting on two different light fixtures the first of which never materialized at all and the second one required THREE shipments before we finally got one with all the required parts. Anyway, it arrived today and we immediately installed it.